Jerry Sullivan formed JSCPM primarily to provide contracting and consulting services for contractors, and developers. We furnished detailed project review and analysis, feasibility studies, conceptual estimates, detailed estimates including quantity take-off with pricing.  Additionally, we provided evaluations of property for suitability for residential subdivision property; construct ability review of property, evaluations of rehabilitation costs of older buildings, and management assistance for smaller construction companies including loan acquisitions and interaction with real estate agents. 

 

 

JSCPM Construction for Buildings Included:

      Tenant improvements and upgrades for commercial offices.

  • Pre construction services and construction for client expanding print services
  • Construction of seismic upgrading of several residential projects.
  • Home improvements and additions including all supervision and required sub-trades

 

 

 

Consulting for Development Projects for Client Complete detailed take-off and pricing of
 commercial projects for larger contractors Preparation of Evaluation and feasibility studies
 of potential projects for development projects. Scope of work included:

 

 

  • Reviewing undeveloped land for potential subdivision
  • Conceptual cost estimating for initial scope of project
  • Evaluation of Zoning and Environmental issues of potential subdivision property
  • Preparation of first cut  hard estimate of construction cost for prospective developments
  • Assisted in preparation of pro-forma projections for land development projects
  • Working with consultants in pre-planning, layout, and preliminary designs
  • Provided extensive reviews of major hillside residential development in San Jose area. Represented
    owner in management presentation in his absence.
  • Assisted in effort to acquire project construction funding
  • Provided preliminary construction planning and estimates for specific project in Shenyang, China.
     

 

 

Golf Courses and Driving Ranges

  • Evaluations of several locations for potential golf course developments
  • Evaluation of sites for driving ranges 
     

 

 

Low Cost Housing for projects in Japan, The Philippines,

  • Involved with extensive 3-year reviews of low cost housing projects in The Philippines. This review included all site, infrastructure needs and cost estimates.
  • Assisted financial group submitting proposals for acceptable pre-packaged modular housing for reconstruction in Kobe, Japan following
    earth quake.
     

 

 

Transportation Studies for projects in Cambodia and Vietnam

  • Prepared comprehensive study of infrastructure costs associated with developing transportation system in Cambodia for Chinese investors
  • Prepared comprehensive study and infrastructure cost involving a water front transportation and delivery system in VietnamCalifornia Client
     

 

 

Hospital Construction

  • Supplied take-over project management for defaulted contractor for Veterans Hospital improvements.
     

 

 

  Dameron hospital in Stockton

  • Construction management of Hospital retrofits for energy conservation of electrical and HVAC system.
  • Coordinated engineering for electrical upgrades required for new x-ray and CAT scan equipment.
  • Responsibility for supervision of all sub-trades
  • Provided reviews and pre-construction planning for $ fifteen million dollar upgrade of Central Utility
    plant for present hospital and additional future expansion.
  • Participated in feasibility analysis for hospital management for leasing nearby facilities for expansion
    of medical office and facilities.
  • Upgrades of kitchen cafeteria equipment.
  • All work above included coordination of drawings with equipment suppliers, architect, electrical and mechanical subcontractors and working closely with hospital engineer and Hospital President. This was
    a two year project  and under approval of OSHPD
  • Provided management for completion of Veterans Hospital as the result of default by original contractor
  • Provided coordination of design, layout, and construction work for 60,000 sf regional out patient Kaiser Hospital Clinic  

 

 

 

Consulting for Surety Company

  • Provided  conceptual estimates of all project to be bonded.  Checked estimate of client if low bidder
    for bonding acceptance
  • Over two year period reviewed contractors and contracts in Western U.S. for bonding company.  Prevented defaults on 6 projects. Interviewed over 50 general contractors for specific projects and prepared reports for surety review department
    of Surety Company from Zurich of North America.
  • Prevented default of contractor on runway and hanger project at major Airport in Southern California. Available for daily
    on-site coordination of communication and scheduling.
  • Investigated several projects for causes of physical defects and inadequate construction.

 

 

 

Inspection of Public Works Projects

  • Onsite inspection of construction for building, installation of pumping facilities, and inspection for
    portion of 36-inch water transmission line in residential area of San Francisco East Bay.
  • Onsite management for cleanup of major sewage pumping facility damaged by overflow caused by defective sensors.  Coordinated installation and recalibration of new equipment.

 

 

 

Supervision of School Construction

     •  Provided on-site supervision of general contractor framing and all sub-trades required for upgrades of
        $ 2.5 million dollar school project for 4 separate structures involving upgrades of electrical, 
        HVAC,structural upgrades, extensive roofing improvements, and
        upgrades of alarm and remote auto controls systems.

 

 

 

Assistance for Construction Lenders

  • Reviewed business plans for several capital projects for major lenders.
  • Checked pro-forma when available, 
  • Developed spreadsheet pro-proforma programs as required to assist lender.

 

 

 

Investigation, consulting, and Expert Witness work for Attorneys

     •  This work consisted of the following type of cases:
     •  Detailed estimates of site, infrastructure, and building construction, and building repair.
     •  Provided examination of construction defects in all areas of construction, observation of
        destructive testing.
     •  Evaluation of standard of care in areas of Project Management, Development, and Construction
        Management
     •  Reviewed standards used in site and building safety as involved in injuries and fatal accidents.
     •  Investigated other construction related subjects required in the investigation of negligent construction,
        mediation, and replacement of facilities.
     •  Prepared extensive reports as required.  Testified in deposition and trial on negligent construction, site
        contamination, and defective  construction.

 

 

 

Names of leg

 

PROJECT  LIST OF JSCPM

Phone: 214-548-4796

General Description of Services Provided

Jerry Sullivan formed JSCPM primarily to provide contracting and consulting services for contractors, and developers. We furnished detailed project review and analysis, feasibility studies, conceptual estimates, detailed estimates including quantity take-off with pricing.  Additionally, we provided evaluations of property for suitability for residential subdivision property; construct ability review of property, evaluations of rehabilitation costs of older buildings, and management assistance for smaller construction companies including loan acquisitions and interaction with real estate agents. 

 

 

JSCPM Construction for Buildings Included:

      Tenant improvements and upgrades for commercial offices.

  • Pre construction services and construction for client expanding print services
  • Construction of seismic upgrading of several residential projects.
  • Home improvements and additions including all supervision and required sub-trades

 

 

 

Consulting for Development Projects for Client Complete detailed take-off and pricing of
 commercial projects for larger contractors Preparation of Evaluation and feasibility studies
 of potential projects for development projects. Scope of work included:

 

 

  • Reviewing undeveloped land for potential subdivision
  • Conceptual cost estimating for initial scope of project
  • Evaluation of Zoning and Environmental issues of potential subdivision property
  • Preparation of first cut  hard estimate of construction cost for prospective developments
  • Assisted in preparation of pro-forma projections for land development projects
  • Working with consultants in pre-planning, layout, and preliminary designs
  • Provided extensive reviews of major hillside residential development in San Jose area. Represented
    owner in management presentation in his absence.
  • Assisted in effort to acquire project construction funding
  • Provided preliminary construction planning and estimates for specific project in Shenyang, China.
     

 

 

Golf Courses and Driving Ranges

  • Evaluations of several locations for potential golf course developments
  • Evaluation of sites for driving ranges 
     

 

 

Low Cost Housing for projects in Japan, The Philippines,

  • Involved with extensive 3-year reviews of low cost housing projects in The Philippines. This review included all site, infrastructure needs and cost estimates.
  • Assisted financial group submitting proposals for acceptable pre-packaged modular housing for reconstruction in Kobe, Japan following
    earth quake.
     

 

 

Transportation Studies for projects in Cambodia and Vietnam

  • Prepared comprehensive study of infrastructure costs associated with developing transportation system in Cambodia for Chinese investors
  • Prepared comprehensive study and infrastructure cost involving a water front transportation and delivery system in VietnamCalifornia Client
     

 

 

Hospital Construction

  • Supplied take-over project management for defaulted contractor for Veterans Hospital improvements.
     

 

 

  Dameron hospital in Stockton

  • Construction management of Hospital retrofits for energy conservation of electrical and HVAC system.
  • Coordinated engineering for electrical upgrades required for new x-ray and CAT scan equipment.
  • Responsibility for supervision of all sub-trades
  • Provided reviews and pre-construction planning for $ fifteen million dollar upgrade of Central Utility
    plant for present hospital and additional future expansion.
  • Participated in feasibility analysis for hospital management for leasing nearby facilities for expansion
    of medical office and facilities.
  • Upgrades of kitchen cafeteria equipment.
  • All work above included coordination of drawings with equipment suppliers, architect, electrical and mechanical subcontractors and working closely with hospital engineer and Hospital President. This was
    a two year project  and under approval of OSHPD
  • Provided management for completion of Veterans Hospital as the result of default by original contractor
  • Provided coordination of design, layout, and construction work for 60,000 sf regional out patient Kaiser Hospital Clinic  

 

 

 

Consulting for Surety Company

  • Provided  conceptual estimates of all project to be bonded.  Checked estimate of client if low bidder
    for bonding acceptance
  • Over two year period reviewed contractors and contracts in Western U.S. for bonding company.  Prevented defaults on 6 projects. Interviewed over 50 general contractors for specific projects and prepared reports for surety review department
    of Surety Company from Zurich of North America.
  • Prevented default of contractor on runway and hanger project at major Airport in Southern California. Available for daily
    on-site coordination of communication and scheduling.
  • Investigated several projects for causes of physical defects and inadequate construction.

 

 

 

Inspection of Public Works Projects

  • Onsite inspection of construction for building, installation of pumping facilities, and inspection for
    portion of 36-inch water transmission line in residential area of San Francisco East Bay.
  • Onsite management for cleanup of major sewage pumping facility damaged by overflow caused by defective sensors.  Coordinated installation and recalibration of new equipment.

 

 

 

Supervision of School Construction

     •  Provided on-site supervision of general contractor framing and all sub-trades required for upgrades of
        $ 2.5 million dollar school project for 4 separate structures involving upgrades of electrical, 
        HVAC,structural upgrades, extensive roofing improvements, and
        upgrades of alarm and remote auto controls systems.

 

 

 

Assistance for Construction Lenders

  • Reviewed business plans for several capital projects for major lenders.
  • Checked pro-forma when available, 
  • Developed spreadsheet pro-proforma programs as required to assist lender.

 

 

 

Investigation, consulting, and Expert Witness work for Attorneys

     •  This work consisted of the following type of cases:
     •  Detailed estimates of site, infrastructure, and building construction, and building repair.
     •  Provided examination of construction defects in all areas of construction, observation of
        destructive testing.
     •  Evaluation of standard of care in areas of Project Management, Development, and Construction
        Management
     •  Reviewed standards used in site and building safety as involved in injuries and fatal accidents.
     •  Investigated other construction related subjects required in the investigation of negligent construction,
        mediation, and replacement of facilities.
     •  Prepared extensive reports as required.  Testified in deposition and trial on negligent construction, site
        contamination, and defective  construction.

 

 

 

 

 

********************************************************************************

Projects for which Jerry Sullivan had responsibility as either a chief superintendent or a senior level Project Manager
 

Major assignments started with Sondgroth Brothers when Jerry was promoted to fill a position that was available when the general superintendent, Don Patton, left to start his own company.  The five Sondgroth Brothers had three distinct areas of construction, paving, site work for schools and commercial developments The third area was one managed by Tom Sondgroth who promoted Jerry to run his section covering construction for subdivisions, freeways and municipal work.  

As a the superintendent for a general site contractor, Jerry had responsibility to schedule and work with all subcontractors , coordinate subcontractor progress with jobsite superintendents, oversee all superintendents on "responsible for profit and loss basis" , and was in charge of all reviewing all invoices on many on-going projects in various stages of construction .
 

Sondgroth Brothers grew to be a large company. After they sold to a consortium of companies Jerry stayed with the new owners and then left after one year.  Jerry left for a similar position with Perham Brothers Construction, a smaller company that had modeled itself upon, and was closely allied with the original Sondgroth Brothers Construction Co.  More details are available in his detailed resume.  When Perham left the construction field to concentrate on developing a 550 acre site, Jerry was recruited to join Nicholson-Brown who was also an engineering contractor, as well as a general building contractor. Jerry started directly as a project manager of a theater building at University of Santa Clara. Within a short time he was managing the construction 3 to 4 projects at the same time.

The use of the term "Project Manager" is used to describe total responsibility for the project including profit and loss. He reviewed the chief estimator''s final estimate and prepared the job codes for use by the field by the superintendents.  After receiving the list of the subcontractor and suppliers to be used on the projects, Jerry was responsible for writing all subcontracts, purchase orders, and overall scheduling of subcontracts or supplier’s .He was responsible for the performance of project superintendents. He prepared quantities and cost for change orders and negotiated change orders, and was responsible for monthly progress billings  

 

 

 

Infrastructure Projects

 MAJOR STATE, COUNTY, OR MUNICIPAL STREET OR SURFACE IMPROVEMENTS COMPLETE

 

 

 

NAME OF PROJECT

 

DESCRIPTION

 

 

 

Los Animas Tech. Park

 

2.5 miles of street work for 180-acre tech. Park.

 

 

 

Maui Research and Tech Park

 

Preliminary designs, street layouts – coordination

 

 

 

Foothill Expressway

 

7 miles of 4 lane expressway and frontage roads

 

 

 

Middlefield Expressway

 

5 miles of expressway connecting Mt. ViewPalo Alto

 

 

 

Evelyn Road Expressway

 

4 miles of 4-lane expressway in Mountain View

 

 

 

San Antonio Road

 

2 miles of 4 lanes of highly traveled street

 

 

 

Newark Blvd.

 

Miles of 6 lane improvements on existing street

 

 

 

Army St. Interchange San Francisco

 

A complex improvement of major interchanges

 

 

 

280/85 Interchange

 

4 Bridge structure on 15 acres of major interchange

 

 

 

Mathilda Overpass, Sunnyvale

 

1 Bridge spanning RR tracks major interchange SV

 

 

 

Santa Cruz Ave. Improvements

 

1 mile of existing street improvement in downtown  Menlo Park

 

 

 

Various Misc. Street Improvements

 

Numerous other small street projects various locations

 

 

 

Mission Campus Site imports

 

Excavation and hauling of 1 million CY by trucks 20 miles to new campus

 

 

 

West Valley Campus Improvements.

 

20 acres of all site work for Community College

 

 

 

Monta Vista School Site Work

 

All site grad3 and paving for 20 acre campus – Cupertino

 

 

 

Runway Repairs for U.S. Navy

 

Repairs to runways and tarmac areas NAS Moffet Field.

 

 

 

 

 

 

Site Work and Infrastructure for Residential and Private Developments

 

 

 

All grading  – on sites and offsets

 

450 subdivisions various locations Santa Clara Val.

 

 

 

Grading and Paving for apartment

 

many large apartment sites in Santa Clara Valley

 

 

 

Brunet Terrace Condos in SF

 

Grading, piers, tiebacks, retaining walls, foundations

 

 

 

Terrabay Development 

 

Site work, and underground for 750 acres in SSF

 

 

 

Sullivan Ranch (member- Rep.)

 

Planning, map work, successful sales effort

 

 

 

 

Recreational Projects Parks and Private and Municipal Golf Courses

 

Sharon Heights Golf Course

 

Rough and Finish grad for 18 holes

 

 

 

Saratoga Hills Golf Course

 

Rough and Finish grade for 18 holes

 

 

 

Blackberry Farms Golf Course

 

Rough and Finish grade for 9 holes – Cupertino

 

 

 

Heakala Greens-Silver Sword

 

Coordination of design and common features- Maui

 

 

 

Sunnyvale Recreational Center

 

Grading, infrastructure, paving, landscape, ponds

 

 

 

Mt. View Recreational Center

 

Grading, Infrastructure, landscape, playfield equipment

 

 

 

Portal ParkSunnyvale

 

All site, landscaping and complete park Sunnyvale

 

 

 

Blarney Park- Cupertino

 

All Construction for this City Park

 

 

 

Murphy Park

 

All Construction for this City Park

 

 

 

Ortega ParkSunnyvale

 

All Construction for this City Park

 

 

 

Building Projects Including all site and infrastructure

As a project manager for Building Contractors starting with Nicholson-Brown Construction Company, Jerry had management responsibilities of individual job site superintendents.  He worked closely
with CHIEF ESTIMATOR  in reviewing costs , the general superintendent, a position that would now
be called an” operations manager”.  He had responsibilities for profit and loss the projects listed below.   He prepared all hard estimates for change orders including pricing.

 

This list also includes the buildings for which he was responsible as a VP, partner

And manager of design and construction of Arroyo Development Corp.
 


Wastewater Treatment Buildings – Collections Systems- Chemical Storage Facilities.
 

IBM Wastewater Treatment Plant            Complete System –treatment industrial chemicals

IBM   Collection System for Plant             Collection system for used chemicals at 17 pickups 2 miles

IBM   Chemical Distribution Bldg.             Storage and Distribution Building with Offices

 

 

 

 

University of Santa Clara Buildings complete all interior work and
 Design Studies and Coordination for Projects

 

 

 

L. B. Mayor Theater

 

500 seat High end Campus Theater and workshops

 

 

 

Faculty Club Historic Renovations

 

Restoration and upgrade, expansion of historic bldg.

 

 

 

Misc. Interior Improvements

 

Interior improvements in dorms and classrooms

 

 

 

Preliminary Design and Construction
estimates

 

Design and build and Construction Proposals for Sullivan Engineering Building and Complex

 

 

 

 

Municipal Buildings Complete Including all Interior Improvements

 

Santa Clara Municipal Court Bldg.

 

5 story Municipal courts bldg, holding cells and site work

 

 

 

 

Industrial Buildings Shells including all Interior Improvements

 

R.W. Taylor Office and Warehouse

 

2 story, 40,000 SF tilt-up office bldg, shops and TI\

 

 

 

Spectra Physics Building, San Jose

 

250,000 SF office Tilt –up shell and heavy framing

 

 

 

Bothelo Office and Warehouse

 

40,000 SF of tilt-up office and interior TI

 

 

 

U.T.C. Test Facilities

 

Misc. concrete Structures and Bunkers

 

 

 

PG&E Edenvale Service Center

 

300,000 SF multiple buildings and storage yard

 

 

 

PG&E  Helms Headquarters

 

All site work and 11 bldgs for Helms water Transfer

 

 

 

Amtec Metals Reclamation Bldg

 

55,000 SF. Industrial distillation for ingots

 

 

 

 

 

 

Financial Buildings – Banks including all Interior and Security

 

 

 

Bank of America  - San Jose,

 

40,000 SF of complete neighborhood bank

 

 

 

Community Bank Branch

 

25,000 SF of Neighborhood area bank bldg

 

 

 

Bank of Santa Clara

 

35, 000 SF of Bank Bldg in Milpitas

 

 

 

Crocker Bank

 

40,000 SF of Neighborhood area bank bldg.

 

 

 

Bascom Building

 

20,000 SF bldg- owned by Arroyo, TI  Work 

 

 

 

 

 

 

Commercial Buildings Complete including all Interior Improvements

 

 

 

The Sequoia Building

 

Rehab of Historic Department store into office space

 

 

 

Various Tenant Improvement

 

T I. In various buildings owned and managed  by Arroyo Dev.

 

 

 

Trade Zone No, 18

 

80,000 bldg on 10 acres of trade zone San Jose

 

 

 

Newberry Department Store

 

Rehab of old Dept. Store Space

 

 

 

Montgomery Wards Store

 

Complete Department Store and all parking lots 

 

 

 

The Bedroom Sales Hqts

 

45,000 SF of showrooms and retail sales space

 

 

 

Grecian Health Spa 

 

50,000 SF of spa, handball courts, office areas.

 

 

 

 

 

 

Jerry Sullivan Managed the concept, design, and provided construction mgmt.
for outside contractor for these buildings:

 

 

 

Arroyo One Building

 

76,000   SF of shell building and 6 acres of site parking

 

 

 

Arroyo One Building

 

25,000 SF of Tenant Improvements

 

 

 

Arroyo One Building

 

Extensive TI work for major tenant

 

 

 

Arroyo One Building

 

65,000 SF of upscale shell of office building

 

 

 

Arroyo One Building

 

40,000 SF of TI work for Kaiser local Clinic

 

 

 

Arroyo One Building

 

45,000 SF of concrete tilt-up shell building

 

 

 

Dusan Tool Building

 

122,000 SF of high Tech building at LATP

 

 

 

Sanchez Building

 

45,000 SF of office building – shell

 

 

 

Dorado Buildings

 

Design coordination for future buildings

 

 

 

Holiday Inn at LATP

 

Design Reviews and preliminary negotiations

 

 

 

Harris Road Business Park

 

Design Reviews and Preliminary Map work

 

 

 

Feasibility Studies Phase two

 

Extensive planning and layout for phase two

 

 

 

Las Animas Technology Park

 

60 acres of anticipated development

 

 

 

 

 

**********************************************************************************

 